PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Raised the slip forms at Stair -4 3rd to 4th Floor Facing South-East (800x600).jpg Building frame around radius at Monumental Stair Facing South (800x600).jpg Carpenters working on the shear wall panels facing South (800x600).jpg Carpenters working on the shear wall panels for Stair -4 Facing North (800x600).jpg Frame around Monumental Stair Facing East (800x600).jpg Insrtalling the metal decking at Derrick -1 Facing West (800x600).jpg Installing metal decking at Derrick -1 Facing South (800x600).jpg Metal decking at Derrick -1 Facing East (800x600).jpg Metal decking at Derrick -1 Facing South (800x600).jpg
Previous pageNext page Frame around Monumental Stair Facing East (800x600)
Frame around Monumental Stair Facing East (800x600)